January:
On 25th January we installed a new boiler to the Rectory basement for hot water supply. The old one became obsolete due to corrosion.
May:
New Xerox Machine was installed for printing the bulletins of the Parish.
June:
The final edition of the Little Flower Monastery souvenir was completed by Fr. Rudolf and Mrs. Molly Dias the Secular Carmelite President.
December:
We installed new bulbs to the entire church. The roof leak was fixed by Cambie Roofing.